Product Description
" target="_blank">Installation Manual
" target="_blank">Installation Manual
The Cowl Fairing comes in two pieces and directs the air around the upper nose gear strut adding 3-4 mph in cruise speed to the aircraft. Drag is also reduced by re-accelerating the exiting air from the cowling and helping it attach back to the fuselage. This kit is extremely effective by itself or when combined with the Nose Gear Fairing. The parts are made from high quality hand laminated epoxy resin fiberglass for superior strength and long life. The kit includes everything necessary for installation including hardware, step-by-step instructions, and STC | |
Part Number: | CBF-206 |
Approval Basis: | Supplemental Type Certificate No(s)SA2381NM |
Replaces: | n/a |
Aircraft Eligibility: | Cessna U206G |
Typical Lead Time: | 2 Days |
Typical Installation Time: | 4 hours Note: Installation times do not include painting |
Finish: | White primer, ready for paint |
Specifications: | Epoxy laminate, Fire rated |
Notes: | n/a |
Documents: |